EHFL loan pipeline reports

Loan pipeline diagnostics for EHFL: where volume and time are lost across the funnel, and when each stage actually moves.
ReportsFunnel diagnosticPipeline hoursOperations diagnosticFix register
Apr 2025 – Aug 2026

Loan funnel diagnostic

Where loan volume and time are lost from lead to disbursal across 80,642 loans initiated in the 17-month window, followed to their status on 14 Sep 2026.

Open report (21 sections) →
Sep 2025 – Aug 2026

When the pipeline moves

Hour-of-day traffic for every pipeline stage: when the desk logs, when credit decides, when money moves.

Open report (9 sections) →
Apr 2025 – Jun 2026

Operations diagnostic — sanction to first EMI

Where sanctioned loans stall between sanction and first EMI: 14,461 sanctions across docket, payment, handover, PDD, tranches, technical, insurance and controls.

Open report (17 sections) →
1 Aug 2025 – 14 Sep 2026

Fix register — region × process step

One row per region and process step where the measured median exceeds the standard, ranked by files × days above standard — 83 rows, 49 of them red.

Open report (3 sections) →
Figures are the extract already circulated; real files only, feeds and bulk lead-initiators excluded. Method and caveats sit at the foot of the funnel diagnostic.